>>> Auditor would have had a field day with that one. Contract should have
>>> been re-competed as the two are hardly equivalent and there actuall is
>>> no such thing as a PDP-VAX. I can't believe there wasn't a protest filed.
>>
>> Cost of the 8 11/70 vs. cost of the 8 11/780 was a tiny part of the
>> contract. I don't know if they created justification for a protest,
>> but when I came on the job I was sure glad to be using VAXen.
>
> having worked on both sides of the contracting issue, I can assure you
> cost has nothing to do with it. If the contract was awarded and any
> changes were made in the deliverables the by the winner of the contract
> after award it would be grounds for a protest.
I suspect the change was made "just in time" before the contract
award.