[Info-vax] x86 Update 01/20/19
Carl Friedberg
frida.fried at gmail.com
Tue Mar 12 16:29:49 EDT 2019
Hi Jon,
Thanks for this update, and great to see you around. Carl
On Tue, Mar 12, 2019 at 3:50 PM Jon Pinkley via Info-vax <info-vax at rbnsn.com>
wrote:
> On Sunday, January 20, 2019 at 4:16:20 PM UTC-5, clair... at vmssoftware.com
> wrote:
> > http://www.vmssoftware.com/updates_port.html
> >
> > The above is now two weeks old and we are further along in creating and
> starting the SYSINIT process.
> >
> > We had been skipping around creating the complete I/O database, based on
> walking the ACPI tables, but that is now complete. We now go end-to-end
> through INIT.MAR with no side steps.
> >
> > We are about to make it through a variety of page faults, creating the
> process page tables, and changing to exec mode. There was a lot of new code
> written many months ago that we are finally getting to step our way through.
> >
> > We can boot the dump kernel.
> >
> > We get as far on a DL380 as we do on VBox.
>
> Sometime within the last week the update page has new items lists. It
> previously was "stuck" at Load I/O Database. There are new items, with
> many being updated. Here is the list as of 2019-03-12
>
> Proof Point Snapshot
>
>
> • Proof Point 1 - ACHIEVED
>
>
> Stop at end-of-SYSBOOT breakpoint & issue “;L” to XDELTA
>
>
>
>
> • Proof Point 2 - ACHIEVED
>
>
> Transition to the Runtime Environment
>
>
> • Proof Point 3 - ACHIEVED
>
>
> Execute first system service call
>
>
> • Proof Point 4 - ACHIEVED
>
>
> Display early loaded image list
>
>
> • Proof Point 5 - ACHIEVED
>
>
> Display VSI welcome banner
>
>
> • Proof Point 6 - ACHIEVED
>
>
> Create PFN database and allocate pool
>
>
> • Proof Point 7 - ACHIEVED
>
>
> Transfer to runtime interrupt dispatching
>
>
> • Proof Point 8 - ACHIEVED
>
>
> System Service transfer vectors in place
>
>
> • Proof Point 9 - ACHIEVED
>
>
> Initialization for primary CPU
>
>
> • Proof Point 10 - ACHIEVED
>
>
> Load remaining execlets
>
>
> • Proof Point 11 - ACHIEVED
>
>
> Reach End of INIT breakpoint
>
>
> • Proof Point 12 - ACHIEVED
>
>
> Display complete loaded image list
>
>
> • Proof Point 13 - ACHIEVED
>
>
> Lower IPL
>
>
> • Proof Point 14 - ACHIEVED
>
>
> Schedule SWAPPER process
>
>
> • Proof Point 15 - ACHIEVED
>
>
> Enter SWAPPER main loop
>
>
> • Proof Point 16 - ACHIEVED
>
>
> $CREPRC; process appears on COMO queue
>
>
> • Proof Point 17 - ACHIEVED
>
>
> Create I/O database
>
>
> • Proof Point 18 - ACHIEVED
>
>
> Set system time
>
>
> • Proof Point 19 - ACHIEVED
>
>
> Establish interval timer
>
>
> • Proof Point 20 - ACHIEVED
>
>
> Load SYS$TTDRIVER
>
>
> • Proof Point 21 - ACHIEVED
>
>
> Load SYS$DMDRIVER
>
>
> • Proof Point 22 - PENDING
>
>
> Initialize file system
>
>
>
>
> • Proof Point 23 - PENDING
>
>
> Mount system disk
>
>
>
>
> • Proof Point 24 - PENDING
>
>
> Create logical names
>
>
>
>
> • Proof Point 25 - PENDING
>
>
> Reach the end of SYSINIT
>
>
>
>
> • Proof Point 26 - PENDING
>
>
> Start DCL
>
>
>
>
> • Proof Point 27 - PENDING
>
> Execute DIRECTORY command
> _______________________________________________
> Info-vax mailing list
> Info-vax at rbnsn.com
> http://rbnsn.com/mailman/listinfo/info-vax_rbnsn.com
>
--
www.comets.com
More information about the Info-vax
mailing list